IndustriaERP

Custom industrial ERP for free trade zones with production, inventory, quality, preventive maintenance, and real-time reporting management.

Client

TangerMed Industries – Tangier

Duration

8 months

Industry
Industry & Manufacturing
Services used
Web DevelopmentconsultingMaintenance & Support

The Challenge

TangerMed Industries, an industrial group operating in the Tangier free trade zone, faced a critical fragmentation of its information systems. Production, inventory, quality, and maintenance were managed by disparate tools — Excel spreadsheets, obsolete software, and paper-based processes — causing frequent errors, production delays, and deficient traceability. Quality audits regularly revealed non-conformities linked to poor process visibility. Unplanned machine downtime cost hundreds of thousands of dirhams per month. The group needed a unified ERP adapted to free trade zone regulatory constraints and capable of interfacing with IoT sensors already installed on production lines.

Our Solution

We designed and deployed a custom cloud ERP covering the entire industrial value chain. The production management module offers visual planning with automatic scheduling and real-time tracking of each manufacturing order. The inventory module integrates batch management with full traceability and intelligent restocking alerts. The quality module automates inspections with digital checklists and ISO-compliant document management. Preventive maintenance, powered by IoT data from machine sensors, automatically schedules interventions before breakdowns. A reporting engine generates real-time dashboards for management with customizable KPIs. The cloud architecture ensures continuous availability and progressive scaling.

Results

+35%

Productivity

-45%

Machine downtime

99.7%

Traceability rate

AivenSoft succeeded where other integrators had failed. The ERP is perfectly adapted to our free trade zone constraints, and the IoT sensor integration gives us unprecedented visibility into our production. Downtime dropped by 45% within six months.

Rachid Tazi

Plant Director, TangerMed Industries

Related Projects